Marketplace    Homes    Jobs    Classifieds    Coupons
[SeMissourian.com] Fog/Mist ~ 39°F  
River stage: 33.62 Rising
Saturday, November 21, 2009
Bridge demolition

1 | 2 | 3 | 4 | 5 | 6 | 7 | >>

July 8, 2004: A crew worked on the Illinois side of the old bridge to prepare for blasting of the eastern spans in August. (Fred Lynch)

Aug. 3: A crowd of spectators await the first blast. (Mark Bliss)

Aug. 3: As seen from a helicopter, dust rises from the blast that dropped the four sections on the Illinois end. (Joel Ray)

Aug. 26: The second blast takes out the next 314 foot span. (Joel Ray)

Aug. 26: The second blast as seen from the north side (Don Frazier)

1 | 2 | 3 | 4 | 5 | 6 | 7 | >>