Workers with Girardeau Stevedores and Contractors, Inc. and Nip Kelley Equipment installed a 1000-foot long, 10-foot wide, 38 thousand pound weathered steel pedestrian bridge over Sloan Creek Wednesday morning, April 27, 2016, in Cape Girardeau. The pedestrian bridge will connect the river walk to Red Star Access.
Connect with the Southeast Missourian Newsroom:
For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.