NewsFebruary 20, 2011

SIKESTON, Mo. -- Minor repair work on the Route ZZ bridge over Drainage Ditch No. 2 in Scott County has been completed. Both lanes of the bridge opened to traffic Friday. "Initially, the lane reduction was expected to be in place for up to three weeks," said Southeast regional field engineer Andy Meyer. "However, work was accelerated and completed in less than a week." For more information, call 888-275-6636 or visit www.modot.org/southeast/safeandsound.htm. ...

Receive Daily Headlines FREESign up today!

SIKESTON, Mo. -- Minor repair work on the Route ZZ bridge over Drainage Ditch No. 2 in Scott County has been completed. Both lanes of the bridge opened to traffic Friday. "Initially, the lane reduction was expected to be in place for up to three weeks," said Southeast regional field engineer Andy Meyer. "However, work was accelerated and completed in less than a week." For more information, call 888-275-6636 or visit www.modot.org/southeast/safeandsound.htm. 

Story Tags

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!