NewsOctober 4, 2013

The Highway 51 bridge over the Mississippi River in Perry County will be reduced to one lane as crews perform a utility inspection. The work will take place from 9 a.m. to 4 p.m. Tuesday. Highway 51 in Bollinger County, between Route H and Water Street, will be reduced to one lane as Missouri Department of Transportation crews perform bridge repairs. The work will be performed from 7 a.m. to 3:30 p.m. Tuesday...

Southeast Missourian

Perry County bridge reduced for utility inspection

The Highway 51 bridge over the Mississippi River in Perry County will be reduced to one lane as crews perform a utility inspection. The work will take place from 9 a.m. to 4 p.m. Tuesday.

Highway 51 in Bollinger County reduced for bridge repairs

Receive Daily Headlines FREESign up today!

Highway 51 in Bollinger County, between Route H and Water Street, will be reduced to one lane as Missouri Department of Transportation crews perform bridge repairs. The work will be performed from 7 a.m. to 3:30 p.m. Tuesday.

All work is weather permitting. Work zones will be marked with signs. Motorists are urged to use caution while traveling near the areas. For more information about the projects, contact MoDOT's Customer Service Center at 888-275-6636 or visit modot.org/southeast.

-- From the Missouri Department of Transportation

Story Tags

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!